Costargrout C40 X

Costargrout–C40 X is a 3-component epoxy resin-based precision fill grouting solution employed for use to fill and reinforce gaps/voids, and secure critical equipment for proper alignment and transmission of static and dynamic loads. It is formulated for easy & quick installation, with good flow characteristics suitable for pouring/pumping, low dust generation, and excellent resistance to chemical attack. Costar Grout C40 X is formulated from carefully selected raw materials for consistency of product, and hardens within 24 hours. It offers exceptional strength, and durability making it an ideal choice for a wide range of applications in various industries, including construction, manufacturing, and transportation.

Download DataSheet

Description

Costargrout–C40 X is a 3-component epoxy resin-based precision fill grouting solution employed for use to fill and reinforce gaps/voids, and secure critical equipment for proper alignment and transmission of static and dynamic loads. It is formulated for easy & quick installation, with good flow characteristics suitable for pouring/pumping, low dust generation, and excellent resistance to chemical attack. Costar Grout C40 X is formulated from carefully selected raw materials for consistency of product, and hardens within 24 hours. It offers exceptional strength, and durability making it an ideal choice for a wide range of applications in various industries, including construction, manufacturing, and transportation.

Features

  • Shrinkage compensating
  • Non-corrosive/non-chloride/non-metallic.
  • Good strength gain and precision infill.
  • Low peak exothermic system for large pours.
  • Excellent effective bearing area capacity.
  • Excellent flow-ability and Non-shrink grout.

Advantages

  • Precision seating of baseplates, Steel Columns and Bearing Plates
  • Precision grouting of wind turbine tower bases requiring excellent final strength gain.
  • Grouting under equipment, including heavy impact and vibratory machinery, reciprocating engines, compressors, pumps, etc.
  • Grouting for “pour-back” anchorage on post tensioning projects (e.g. segmental bridge).